You can't fix what you don't count. Start logging every unplanned stoppage with duration, cause and the asset involved — even a simple register beats memory. Within a month, your worst offenders stop being opinions and start being a list.
- 1. Measure it properly first
Sort your downtime log by asset and cause. The top two or three repeat failures usually account for a disproportionate share of lost hours. Root-cause those first — the rest of the list can wait.
- 2. Fix repeat failures, not just failures
Half of long stoppages are really waiting-for-parts events. A criticality-ranked spare-parts list turns an eight-hour breakdown into a one-hour swap.
- 3. Get critical spares on the shelf
For the machines that hurt you most, periodic checks aren't enough — a failure that develops between inspections still lands as unplanned downtime. Continuous vibration or temperature monitoring catches the fault while there's still time to plan the repair.
- 4. Move the top assets onto condition monitoring
Every failure should end in a work order that records what happened, what fixed it and what prevents a repeat. That's the dataset that turns step 1 into a permanent improvement cycle instead of a one-off project.
- 5. Close the loop