Complete and close out work
Closure is where the history is written — capture cause, fix and follow-ups before closing.
Closing a work order is more than ticking it off — the closure notes are the asset's memory. Six months from now, 'compressor relay replaced, fault traced to power dip' is the difference between a diagnosis and a guess.
- Before you close
If the fix didn't hold, reopen rather than duplicating — the repeated failure on one record is exactly the signal reliability analysis looks for. Temporary fixes should always spawn a follow-up with a due date.
- Follow-ups and failures